>
 
Dimond
SEARCH
New User   |  Sign in
 
 

Dimond Case Studies- Longrun roofing, cladding, rainwater and structural products.


« Return to List « Prev Item  |  Next Item»  

The new 147mm Fascia

October, 2010
Following the release of the new 147 Fascia in September 2010, Dimond in conjunction with Rainaway and Jennian Homes have completed their first residential install of the new 147

Client
Residential Home via Jennian Homes

Details
The first 147mm Fascia solution has been rolled out in the Central North Island - The client was after a stylish panel with straight lines.

The Solution
Our customer and supplier comments indicate that the 147 in the Solution:
"My first impressions of the 147 Facia is very good.
The heavier gauging provides straighter lines and with the longer lengths I am also pleased to see less joins. The soffit junction detail is better than our previous style which will give me a tighter hold resulting in no soffit rattle in very high wind zones".
Simon Penn - Jennian Homes Wanganui
"The system included easy to follow setup details and hip corners were easy to fit to achieve a high standard finish”
Graham McLay - Rainaway Manawatu


TOP

For comprehensive information on Dimond systems which include CAD drawings, Installation documents and PDF downloads, use one of the following links below

Dimond Roofing & Cladding Systems Manual
Dimond Roofing & Cladding Systems Manual
Dimond Structural Systems Manual
Dimond Structural Systems Manual
 
A Fletchers Building Company © Dimond, all rights reserved. Please read our Privacy Policy and Terms & Conditions.
Dimond is a member of the Roofing Association of New Zealand Roofing Association NZ

Powered by streamSWEET CMS